
REHAU’s flexible plumbing and heating pipework has been installed by M&E contractors Lorne Stewart in a new development for Signpost Housing Association in Plymouth. REHAU’s Everloc system is supplied to site on large coils so that it can be simply unrolled to the lengths required for quick and easy connection to the radiator tails. A pipe in pipe flexible ducting system also makes the installation even simpler and reduces time and costs on site.